sprockets A:M Decaling Screen frosted donut medals buildings Rubik's Cube Nidaros Cathedral Tongue Sandwich
sprockets
Recent Posts | Unread Content | Previous Banner Topics
Jump to content
Hash, Inc. - Animation:Master

thejobe

Craftsman/Mentor
  • Posts

    1,137
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by thejobe

  1. i like the stuff. very interesting. little lost but that just means i don't understand the premise of the post. I'm an artist as well and a musician so i understand where hes coming from. but i think he needs more comprehensive of his message
  2. The software is still on the table. Got to figure out the format i want to go with because I had some idea for it but don't want to release anything yet because there might he some money involved and maybe a design patent. The couch is actually a modified version of a lazy-boy couch sofa set. The update Version actually reclines which ill be posting next week in the freebies section. The gym is an actual full size gym with weight sets dumbbells and other equipment. These are still drafts nowhere near done. I got a year to finish this project.
  3. ill never understand how you people make characters like that. just amazing work
  4. I'm running on a pretty old machine since my new machine is down. This is on a 2 ghz amd 64. Average time for a 800x600 is about 2 hours.
  5. Haven't figured the colors yet so ill try other stuff and the pluming haven't brought up yet.
  6. its radiosity. OK so ill take off all spec settings. As for the counter top how would I lessen the bleed from the walls.
  7. heres a render of the bathroom. can anyone tell me why i have so much saturation in the counter top and doors and the bed looks like plastic wrap render time was 1:35:50
  8. the right side of that part of the basement is the water pump and water purification system. it needed its own entrance way since he didn't want it in the bathroom.
  9. not sure if there's going to be a bar but hey the new person moving is a drinker so who knows lol and yes i placed the lights as of where he is asking the electrician to installing them. 1 in every room and 3 in the main room (pool area, living room, gym area) total of 6 lights. I've been working on the renders as i keep adding more decorations. since i want to get this as close as possible to what the finish product is going to be. this is the top view of the basement.
  10. the couch is not my choice this is all my friends idea. his house his choices. i just build what he tells what he wants it to look like
  11. OK so, for the past 3 months ive been working on this project for a friend of mine he is going to be building an apartment in his basement and came to me as a cheaper alternative to a architect. first half was taking measurements (got about 6 pages worth), then i had to get the base drawings down (took me weeks!). now im finally up to building the model to scale. theres 2 more steps before i complete this project. next step is to get full size renders of the finished basement. then is to design a program for a virtual walkthru of the basement. right now im doing the test renders of the finished basement. wanted to get some opinions and ideas on the best way to render this. this is the best renders as of right now. i am using radiosity to get the most realistic renders possible these are the settings im using. the camera is just using multipass 25
  12. thejobe

    Go Kart 2

    glad you got it the way you wanted it.. i live out in the middle of no where so only gokarts i have ever seen are offroad ones like the one i own which is what the orginal model was based off from.
  13. yes awsome ty!
  14. man that must have been a lot of work... good job!
  15. thejobe

    GoKart

    nope just didnt have the time before now to do it. first it was work then i was in Germany then it was more work then meetings then sleep then more work then a nap then i had time for it lol
  16. thejobe

    GoKart

    Hey guys i forget who asked me for this model i remember it was sometime back in spring I finally found time to get around to it this took about 4 hours to model total hope you all like it it was created in V16 Enjoy! gokart.zip
  17. hey rob was that video i made good enough quality?
  18. i have been known to laugh and run away like that on certain occasions
  19. Wow you actually thought it was cool. I wonder what you say if I tried to make them turn or something. I was going to add partical effects to the engines but that would add 10 hours of rendering.
  20. For some reason the v16 doesn't render right Nd everything comes out black or it has a solid color to it when its suppose to have texture.
  21. well after a few tries at getting the render time down, i went with basicly the lowest form of rendering Multipass=1 no A/O everything else the same. it rendered in 2 hours and after some editing and sound effects this is what the outcome was so ... Enjoy! thejobe_busstop2.mov
  22. just 2 ships i built back in version 12 their not that complicated ship one has 540 patches ship two has 1940 which is only on screen for 3 secs out of the 6 secs that the whole video is. 1 pass is taking roughly 20 mins to do. and no i have nothing running in the background
  23. just 2 ships i built back in version 12 their not that complicated ship one has 540 patches ship two has 1940 which is only on screen for 3 secs out of the 6 secs that the whole video is. 1 pass is taking roughly 20 mins to do. and no i have nothing running in the background
  24. i got something that looks like an animation but got a problem... with the current settings you have for the prj. for a 6 secs video to render it says the average time for it to finish is somewhere around 545 hours.... i dont think i can let my computer run for that long on a single render... is there a faster way to get it to render
  25. I can try but I'm completely horrid at animating
×
×
  • Create New...