nf1nk Posted August 10, 2007 Posted August 10, 2007 I a starting my steam punk Short. So using a Top down methodology I am starting with the control panel, working out to the wheel house then to the boiler and engine room, and then throwing a skin on the whole thing. Here is the gauge panel. the colors are place holders at this point. Quote
nf1nk Posted August 14, 2007 Author Posted August 14, 2007 One step at a time, progress is slow Quote
arkaos Posted August 14, 2007 Posted August 14, 2007 How's he going to be able to read the gauges with all those levers in the way? Quote
nf1nk Posted August 15, 2007 Author Posted August 15, 2007 Good thought. maybe I will need to move the compass down and put the gauges above them on a shelf I think a redesign is in order. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.